
Roadway Activity Report for the Lower East and Upper Cumberland (April 10 - 16, 2025)
DISTRICT 27
CLAY, CUMBERLAND, DEKALB, PICKETT, PUTNAM, AND WHITE COUNTY The ADA curb ramp upgrades on various State Routes: The contractor will be removing and replacing curb ramps in Putnam County between LM 9.75 and LM 13.39 (between Jackson Street and 12th Street) on SR 135. During this work, sidewalk closures will be in place and outside lane closures will be used to facilitate the work. The contractor will also begin work removing and replacing curb ramps in Putnam County on SR 24 between LM 17.92 and 20.77 (Garrett Avenue and Neal Street). Lane closures will used, and flaggers will be present to control the flow of traffic through the work zone. Motorists are encouraged to use caution through the work zone and should be prepared to stop.
[MarCor Construction, Inc./Cookeville/CNY252]
CUMBERLAND COUNTY SR-28 (US-127) bridge construction and paving from north of I-40 (LM 17.8) to near Potato Farm Road (LM 22.7): The contractor continues grading activities throughout the project limits. Temporary lane closures and/or periodic traffic stoppages will be necessary for construction activities. The contractor has closed North Grace Hill Drive at the existing intersection of SR-28 (US-127) for construction activities. Motorists should utilize South Grace Hill Drive as the detour with appropriate signs. Traffic has been moved to temporary alignment on Plateau Road and permanent alignment on Potato Farm Road. Flaggers and advanced warning signs will accompany any closures. Motorists should use caution when traveling through the work zone as traffic patterns change. [Jones Bros. Contractors, LLC/Crossville/CNV009]
CUMBERLAND COUNTY SR-24 (US-70 N.) Utility Work both directions from LM 0 to LM 3: Flagger assisted lane closures on SR-24 (US-70 N) from the Putnam County line to West of Falls Road. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 04/10/25 thru 06/15/25 from 9 am - 2 pm. [2024-870]
CUMBERLAND COUNTY SR-1 (US-70) construction of bridge over the Obed River (LM 12.7): Construction activities continue on SR-1 (US-70) over the Obed River bridge. SR-1 has been reopened. Construction crews will be working outside of the roadway to install utilities. Traffic should be cautious of construction equipment near the shoulders. Contractor may need to flag traffic to move equipment or vehicles across the road.
[Whaley Construction, LLC/Crossville/CNX110]
CUMBERLAND COUNTY SR-28 (Main Street, US-127) downtown pedestrian improvement project between Lantana Road (Highway 70 East) and Neecham Street: Construction activities are ongoing along SR-28 (Main Street). The contractor is working on removing and replacing the concrete sidewalk and curb ramps from Lantana Road to West 2nd Street. The contractor will be pouring concrete beginning from Lantana Road to West 2nd Street. During this time, the contractor will utilize flaggers, and the road will be reduced to one lane for a period of time. Once operations are completed for the day, traffic will be reopened to two lanes. The shoulder parking along this area has been closed. Signs and flaggers may be utilized during these lane closures and/or lane shifts. Motorists should use caution when traveling through the work zone. [Adams Contracting, LLC/Crossville/LP24_1]
CUMBERLAND COUNTY SR-299 repair of bridge over I-40 MM 338.5 (LM 2.8): Construction activities may be necessary in the area. SR-299 has been opened to both lanes of traffic. If a lane is closed, signs and flaggers or the signals will accompany. [Jamison Construction, LLC/Crossville/CNY062]
CUMBERLAND COUNTY SR-462 from SR-28 (US-127N / LM 3.1) to SR-298 (Genesis Road / LM 4.6) in Crossville: Construction activities are in progress. The contractor anticipates paving operations between US-127 and Old Jamestown Hwy. Activities may require temporary lane closures and/or traffic stoppages on Interstate Drive (SR-462), as well as short term closures of city streets. Flagging operations will accompany these closures with appropriate signs. Motorists traveling west on Interstate Drive should be mindful of the "Right Turn Only" lane at the intersection of Stout Drive. Motorists should use caution when traveling through the work zone. [Rogers Group, Inc./Crossville/CNV010]
CUMBERLAND AND FENTRESS COUNTY SR-28 (US-127) widening from near N. Lowe Rd (LM 29.2) to north of SR-62 (LM 1.9): The contractor will continue work along the new alignment of SR 28. Flaggers are being intermittently used to control traffic through parts of the work zone. Motorists are encouraged to use caution and watch for construction equipment and personnel adjacent to the roadway. [Jones Bros. Contractors, LLC/Cookeville/CNV300]
DEKALB COUNTY SR-26 (US-70) grading, drainage, and construction of retaining walls and paving from near SR-53 (LM 2) to near SR-96 (LM 6.1): The contractor continues grading and construction activities throughout the project. Temporary lane closures and periodic traffic stoppages will be necessary for construction activities and motorists should be prepared to stop while traveling through the work zone. Motorists are encouraged to obey posted speed limit and to watch for construction equipment and personnel adjacent to the roadway. The West end of Old Liberty Road will be closed to through traffic due to construction activities. Motorists and EMS will need to use the East entrance of Old Liberty Road to gain access and follow detour signs. [Twin K Construction/Cookeville/CNV012]
OVERTON COUNTY SR-52 resurfacing from east of SR-294 (LM 12.2) to near Dogwalk Road (LM 18.3): The contractor plans to begin resurfacing operations 4/10/25. Temporary lane closures will be used along with flaggers to control traffic through the work zone. Motorists are encouraged to use caution and watch for construction equipment and personnel.
[Rogers Group, Inc./Livingston/CNZ039]
PUTNAM COUNTY I-40 Utility Work both directions from MM 273 to MM 286: THP / Officer assisted rolling roadblock on I-40 beginning eastbound at MM 273 (Smithville-McMinnville Hwy 56 exit) and westbound at MM 286 (South Willow Cookeville Hwy 135 exit). Message boards, signage, and law enforcement vehicles will be present along I-40 and ramps. Motorists should be prepared to stop and expect delays. 04/13/25 from 6 am to 8 am, with a rain date of 04/27/25. [2025-140]
PUTNAM COUNTY SR-136 construction from north of the SR-111 interchange to south of the I-40 interchange: The contractor continues grading activities throughout the project. Temporary lane closures and/or periodic traffic stoppages will be necessary for construction activities. Pigeon Roost Creek Road remains closed, at the intersection of SR-136 with detour signs to utilize West Cemetery Road. In addition, the turning lane serving Prescott South Middle School has been taken out of service and northbound Jefferson Avenue will be restricted to one lane. Motorists are encouraged to use caution while traveling through the work zone and be aware of construction personnel.
[Rogers Group, Inc./Cookeville/CNV284]
PUTNAM COUNTY SR-111 (STATE HWY. 111) Utility Work both directions from LM 1 to LM 6: Flagger assisted lane closures on SR-111 between S. Jefferson Avenue and the intersection of SR-111 and SR-24. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 04/10/25 thru 04/16/25 from 9 am - 2 pm. [2025-069]
PUTNAM COUNTY SR-136 (S. JEFFERSON AVE.) Utility Work southbound from LM 2.55 to LM 2.75: Southbound lane closures on SR-136 (S Jefferson Ave) between Spring Street Town Square to I-40. Motorists should reduce speed and be prepared to stop. Arrow board/message boards, flaggers, and barrels/cones will be present, 11/14/24 through 04/30/25 from 9 am - 2 pm. [2024-640]
PUTNAM COUNTY SR-164 (N. CHESTNUT ST.) Utility Work both directions from LM 0 to LM 4: Shoulder and lane closures on SR-164 (N. Chestnut Street/Hanging Limb Road) between E. Commercial Ave (SR-62) and Berryfield Road (Mineral Springs Freewill Baptist Church) in Overton County. Motorists should reduce speed and be prepared to stop if needed. Arrow board/message boards, flaggers, and barrels/cones will be present, 04/10/25 thru 05/30/25 from 8 am - 3 pm. [2024-855]
PUTNAM COUNTY SR-24 (CROSSVILLE HWY.) Utility Work both directions from LM 33 to LM 41: Flagger assisted lane closures on SR-24 (Crossville Hwy) between Pen Hook Road and Cumberland County line. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 04/10/25 thru 05/30/25 from 9 am - 2 pm. [2024-870 & 2024-871]
PUTNAM COUNTY SR-62 (CLARKRANGE HWY.) Utility Work both directions from LM 0 to LM 8: Shoulder and lane closures on SR-62 (Clarkrange Hwy) between Elm Street and Cumberland Lake Drive. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 04/10/25 thru 05/30/25 from 9 am - 2 pm. [2024-857]
PUTNAM COUNTY SR-84 (W. COMMERCIAL AVE.) Utility Work both directions from LM 9 to LM 10: Flagger assisted lane closures on SR-84 (W. Commercial Avenue) between the intersection of SR-24 (Holley Street and SR-84 to Poplar Street. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 04/10/25 thru 05/30/25 from 9 am - 2 pm. [2024-868]
WHITE COUNTY SR-136 (OLD KENTUCKY RD.) Utility Work northbound from LM 18 to LM 19: Flagger assisted lane closures on SR-136 (Old Kentucky Road) between S. Bunker Hill Road and John England Road. Motorists should reduce speed and be prepared to stop. Arrow board/message boards, flaggers, and barrels/cones will be present, 04/16/25 from 8 am - 10 am. [2025-209]
DISTRICT 28
BLEDSOE COUNTY SR-30 and SR-443, the grading, drainage, stream relocation, widening, and resurfacing on Summer City Road: The contractor will be performing grade work and widening on Summer City Road in Bledsoe County. This work will narrow the lanes at LM 2.0 and LM 4.3 and will leave both lanes open to traffic. Please slow down and use caution when driving through the work zone. [Rogers Group, Inc./Dunlap/CNY153]
COFFEE COUNTY I-24 TDOT Maintenance eastbound from MM 118.6 to MM 123.5: I-24 04/10/25 Starting at 8 AM MM 118.6-123.5 EB.
COFFEE COUNTY I-24 (MM 117) construction of an overpass carrying Wattendorf Memorial Highway/AEDC Road, including grading, drainage, retaining walls, and paving: There will be a full closure of the eastbound entrance and exit ramps on 04/13/2025 from 7 PM to 6 AM. There will be a full closure of the westbound entrance and exit ramps on 04/14/2025 from 7 PM to 6 AM. There will be a closure of one lane both directions on I-24 on 04/15/2025 and 04/16/2025 from 7 PM to 6 AM. 04/17/2025 will be a backup date for any potential weather delays.
[Jones Bros. Contractors, LLC/Tullahoma/CNZ029]
COFFEE COUNTY I-24 (MM 105) construction of an overpass carrying SR-2 (US-41): Phase 2 of I-24 bridge replacement at Exit 105 will continue this week. SR-2 will be reduced to one lane utilizing traffic signal system. The temporary traffic signal will remain in effect until 10/16/25. Closures on I-24 and US-41 for phase 2 beam erection will continue. Nightly operations will vary depending on work progression, but motorists are advised to expect delays. From 7 PM to 6 AM nightly, I-24 will be reduced to one lane and diverted over the interchange ramps across US-41 and back on I-24. US-41 will be closed with signed detours in place. [Bell and Associates Construction, LP/Tullahoma/CNX309]
COFFEE COUNTY SR-55 construction from First Avenue (LM 2.0) to SR-16 (US-41A, N. Jackson St, LM 2.6) in Tullahoma: Phase 1 of roadway widening and bridge replacement on SR-55 (Wilson Ave.) will continue this week. Contractor may use temporary lane shifts to complete utility work. Phase 1 traffic shift has reduced lanes from 3 to 2 across the bridge over Rock Creek in order to start bridge replacement work. [Dement Construction Company, LLC/Tullahoma/CNX912]
COFFEE COUNTY SR-55 repair of the bridge over the Little Duck River (LM 14.0): Lanes are reduced to one lane in each direction across the SR-55 bridge over the Little Duck River for bridge repair work. This lane reduction will be in place until work is complete on 7/31/25. [Mid-State Construction Company, Inc./Tullahoma/CNX412]
FRANKLIN COUNTY Old Decherd Road over Wagner Creek (LM 0.3) construction of a bridge: Old Decherd Road is closed at Wagner Creek for bridge replacement. A signed detour is in place. The road closure will be in place for the duration of the project through June 30th, 2025. RESTRICTIONS: Old Decherd Road at Wagner Creek is closed.
[Dement Construction Company, LLC/Tullahoma/CNY068]
FRANKLIN COUNTY SR-50 (US-64) repair of the bridges over Old Alto Highway (LM 16.9): There will be alternating lane closures for bridge repair activities. [Jones Bros. Contractors, LLC/Tullahoma/CNY097]
GRUNDY COUNTY I-24 TDOT Maintenance eastbound from MM 128.5 to MM 133.3: I-24 04/09/25-04/10/25 Starting at 8 AM MM 128.5-133.3 EB
MARION COUNTY SR-156 repair of bridge over Tennessee River, LM 15.2: The contractor will be performing painting operations and structural repairs on the SR-156 bridge over the Tennessee River in South Pittsburg. This work will require a traffic shift leaving both lanes open to traffic. Please use caution when driving through the work zone.
[Olympus Painting Contractors Inc./Dunlap/CNY063]
WARREN COUNTY SR-1 (US-70S) bridge repair over SR-55 (LM 10.5): The contractor will maintain the closure of lane 2 (slow lanes) on SR-1 on both the EB and WB sides on the bridges with portable barrier rail and drums. These closures are Phase 1 and will remain in place for bridge repair operations for the foreseeable future. Under the bridge on SR-55 Bypass the portable barrier rail will remain in place long term, closing the outside shoulders under the bridge. Temporary lane and shoulder closures on and surrounding over and under bridge will also be utilized as needed with proper signing. RESTRICTIONS: Maximum width 15 feet both directions.
[Mid-State Construction Company, Inc./McMinnville/CNY196]
DISTRICT 29
BRADLEY COUNTY I-75 at Paul Huff Parkway Interchange modifications: During this reporting period, the contractor will continue work on permanent signs. Intermittent flagging operations and temporary lane closures may be necessary. Motorists are advised to reduce speed and use caution in the work zone. [Summers-Taylor, Inc./Cleveland/CNX362]
BRADLEY COUNTY SR-60 widening from the 4-lane north of I-75 (LM 17.2) to SR-306 (LM19.9): During this reporting period, the contractor will continue grading work and install new curb & gutter. Intermittent flagging operations will take place throughout the project during various work activities. Grading activities will take place on Weston Hills Drive to complete the new vertical alignment connection to SR-60. Motorists are encouraged to use caution when entering and exiting the neighborhood. The speed limit in the work zone has been reduced to 35 mph. Motorists are advised to use caution in the work zone and watch for flaggers assisting with traffic control.
[Summers-Taylor, Inc./Cleveland/CNV130]
BRADLEY COUNTY SR-311 resurfacing from SR-60 (LM 5) to SR-74 (LM 6.1): During this reporting period, the contractor will continue punch list work on SR-311. Intermittent flagging operations may be necessary around the work area. Motorists are advised to reduce speed and use caution in the work zone. [Wright Brothers Construction Company, Inc./Cleveland/CNX132]
BRADLEY COUNTY SR-40 (US-64) resurfacing from SR-2 (US-11, US-64, LM 0.0) to near McKamy Street (LM 1.2): During this reporting period, the contractor is scheduled to continue punch list work on SR-40. Intermittent lane closures and flagging operations will be necessary during this work. [Wright Brothers Construction Company, Inc./Cleveland/CNX132]
BRADLEY COUNTY SR-74 resurfacing from SR-311 (LM 12.7) to SR-40 (US-64, LM 13.9): During this reporting period, the contractor will continue punch list work on SR-74. Intermittent flagging operations may be necessary around the work area. Motorists are advised to reduce speed and use caution in the work zone. [Wright Brothers Construction Company, Inc./Cleveland/CNX132]
HAMILTON COUNTY I-75 Utility Work both directions from MM 3 to MM 15.6: THP / Officer assisted rolling roadblock on I-75 beginning southbound at MM 20 (64 By-Pass East in Cleveland exit) in Bradley County and northbound at MM 3 (E. Brainerd Road exit) in Hamilton County. Message boards, signage, and law enforcement vehicles will be present along I-75 and ramps. Motorists should be prepared to stop and expect delays. 04/13/25 from 6 am to 8 am. [2024-295]
HAMILTON COUNTY SR-17 (BROAD ST.) Utility Work both directions from LM 2 to LM 3: Shoulder and lane closures on SR-17 (Broad Street) between W. 13th Street and W. 20th Street. Motorists should reduce speed and be prepared to stop if needed. Arrow board/message boards, flaggers, and barrels/cones will be present, 04/10/25 thru 04/16/25 from 9 am - 2 pm. [2025-193]
HAMILTON COUNTY SR-2 (BRAINERD RD.) Utility Work both directions from LM 14 to LM 15: NIGHTTIME Flagger assisted lane closures on SR-2 (Brainerd Road) between Spring Creek Road and Howell Avenue. Motorists should reduce speed and be prepared to stop. Arrow board/message boards, flaggers, and barrels/cones will be present, 03/03/25 through 05/30/25 from 9 pm - 5 am. [2025-016]
HAMILTON COUNTY SR-27 (ROSSVILLE BLVD.) Utility Work both directions from LM 6 to LM 8: Shoulder and lane closures on SR-27 (Rossville Blvd) between E. 31st Street and E. 44th Street. Motorists should reduce speed and be prepared to stop or detour if needed. Arrow board/message boards, flaggers, and barrels/cones will be present, 02/20/25 thru 05/22/25 from 9 am - 2 pm. [2024-768, 769, 770]
HAMILTON COUNTY SR-317 (APISON PK.) Utility Work both directions from LM 7 to LM 8: Flagger assisted lane closures on SR-317 (Apison Pike) between La Collina Way and Ooltewah Ringgold Road (SR-321). Motorists should reduce speed and be prepared to stop. Arrow board/message boards, flaggers, and barrels/cones will be present, 04/15/25 from 9 am - 1 pm, with a rain date of 04/22/25. [2025-165]
HAMILTON COUNTY SR-319 (HIXSON PK.) Utility Work northbound from LM 7 to LM 8: Shoulder and lane closures on SR-319 (Hixson Pike) between Cassandra Smith Road and Big Ridge Road. Motorists should reduce speed and be prepared to stop. Arrow board/message boards, flaggers, and barrels/cones will be present, 04/15/25 from 9:30 am - 2 pm. [2025-194]
HAMILTON COUNTY SR-8 (E. MAIN ST.) Utility Work both directions from LM 7 to LM 8: Shoulder and lane closures on SR-8 (E. Main Street) between Slayton Street and Gulf Street. Motorists should reduce speed and be prepared to stop if needed. Arrow board/message boards, flaggers, and barrels/cones will be present, 04/07/25 thru 04/16/25 from 9 am - 2 pm. [2025-126]
HAMILTON COUNTY I-124 (US-27) from I-24 Interchange to South of the Tennessee River Bridge: Daily lane closures are possible between 9 AM and 3:30 PM as the contractor work along the ramps and 4th Street. Motorists are advised to reduce speed in the work zone and watch for flaggers assisting with traffic control. [Stansell Electric Company, Inc./Chattanooga East/CNY900]
HAMILTON COUNTY I-75 at the Hamilton Place Mall interchange: The SR-153 southbound ramp to I-75 northbound has been reduced to one lane. Traffic shifts have been implemented on I-75 northbound, Shallowford Road entrance ramps, and Shallowford Road exit ramps and Hamilton Place Mall exit ramp. The speed limit has been reduced on I-75 throughout the project limits. Nightly lane closures are permitted 8 PM to 6 AM. Motorists should use caution, paying attention to construction signage and watching for construction vehicles and personnel. [Summers-Taylor, Inc./Chattanooga West/CNX358]
HAMILTON COUNTY SR-2 (US-11, US-64) McCallie Tunnel cleaning: The McCallie Tunnel will be cleaned 04/16/2025 from 8 PM to 6 AM. A flagging operation will be setup to direct traffic as one tube will be cleaned at a time. This work is weather permitting. [Diamond Specialized, Inc./Chattanooga West/CNY133]
HAMILTON COUNTY SR-317 (Apison Pike) improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Lane closures and flagging operations will be required on SR-317, Apison Pike, for bridge and grading work. The flagging operations will be performed on 04/10/25, 04/11/25, 04/14/25, 04/15/25, and 04/16/25 from 7 AM to 1 PM and 3 PM to 7 PM. Closures will last about 2 hours per location. The contractor will have intermittent flagging operations during daytime non-peak hours for bridge work, delivery of materials and equipment.
[Wright Brothers Construction Company, Inc./Chattanooga East/CNT336]
HAMILTON COUNTY SR-8 (US-127) Stringers Ridge Tunnel cleaning: The Stringers Ridge Tunnel will be closed 04/16/2025 from 8 PM to 6 AM for cleaning. A detour will in effect during the closures to direct traffic to alternative routes. This work is weather permitting. [Diamond Specialized, Inc./Chattanooga West/CNY133]
HAMILTON COUNTY SR-8 (US-41, US-76) Bachman Tubes cleaning: The Bachman Tunnel will be closed 04/17/2025 from 8 PM to 6 AM for cleaning. A detour will in effect during the closures to direct traffic to alternative routes. This work is weather permitting. [Diamond Specialized, Inc./Chattanooga West/CNY133]
MCMINN COUNTY SR-39 construction of a bridge over Middle Creek (LM 13.4): During this reporting period, the Northbound and Southbound traffic will be reduced to one lane and controlled by traffic signals. County road 567 will be closed to traffic (LOCAL TRAFFIC ONLY) and detoured to SR039. This closure is necessary to perform the bridge replacement. The lane restriction will remain in place until the bridge replacement is completed.
[Whaley Construction, LLC/Chattanooga East/CNX069]
MCMINN COUNTY SR-39 from west of Cook Drive to SR-30 and from SR-310 to the Monroe County Line: During this reporting period the contractor will begin construction sign installation. Motorists should be aware of workers in the area performing this work. Intermittent flagging operations around the work area may be necessary.
[Rogers Group, Inc./Cleveland/CNZ038]
MEIGS COUNTY SR-60 (STATE HWY. 60) Utility Work both directions from LM 3.09 to LM 3.25: Traffic will be reduced to one lane both directions with a flagging operation on SR-60 over the Tri-County Veterans Bridge at the Rhea-Meigs County Line. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 02/23/24 through 04/24/25 from 8am - 4pm, weather permitting. [133847.00 - Utility Department]
POLK COUNTY SR-68 construction of bridge over Brush Creek (LM 16.4): During this update period, the contractor will begin phase 2 bridge construction. A temporary traffic signal system is active on SR-68 near LM 16.4. The northbound lane of SR-68 will be closed in the area controlled by the temporary traffic signal system. Motorists are advised to reduce speed and use caution in the work zone. Motorists should also be aware that traffic was recently moved onto a portion of the new bridge and there is a new traffic pattern through the project site.
[Wright Brothers Construction Company, Inc./Cleveland/CNX347]
POLK COUNTY SR-68 over SR-40 the construction of bridges: During this reporting period the contractor will begin construction sign installation. Motorists should be aware of workers in the area performing this work. Intermittent flagging operations around the work area may be necessary.
[Wright Brothers Construction Company, Inc./Cleveland/CNZ042]
RHEA COUNTY SR-29 (US-HWY. 27) Utility Work southbound from LM 1.5 to LM 5: Shoulder and lane closures on SR-29 (US-HWY 27) between Ellis Lane and Laurel Drive. Motorists should reduce speed and be prepared to stop if needed. Arrow board/message boards, flaggers, and barrels/cones will be present, 04/10/25 from 10 am - 11 am, with a rain date of 04/11/25. [2025-111]
RHEA COUNTY SR-30 repair of bridge over Tennessee River: The repair of the bridge on S.R. 30 over the Tennessee River (L.M. 17.28): The bridge has been reduced to one lane of traffic under the control of a traffic signal. The contractor will be making repairs under the Tennessee River Bridge. Watercraft users should use caution when accessing the TWRA boating ramp under the bridge in Rhea County. The contractor will have equipment and materials in the area of the access road for the boating ramp. [Mid-State Construction Company, Inc./Chattanooga East/CNY201]
REGION WIDE
REGION 2 Dynamic Message Sign (DMS) Life Cycle Replacement: The Contractor will be replacing overhead Dynamic Message Signs (DMS). Shoulder Closures will be in place on Bradley I-75 NB between MM 25 and MM 35, on McMinn I-75 SB between MM 44 and MM 36, and Marion County I-24 WB at MM 156. Trucks will be entering and exiting the work zone during daytime hours. Nightly lane closures may be needed at these locations. RESTRICTIONS: BRADLEY I-75 NB BETWEEN MM 25 and MM 35 AND MCMINN I-75 SB BETWEEN MM 44 and MM 36 both the inside and outside shoulders will be closed with concrete barrier rail installed. Total width will be 24 feet wide. Wide loads may need to utilize both lanes of traffic through this area.
[Davis H. Elliot Construction Company, Inc./Chattanooga East/CNX413]
REGION 2 Installation of new and upgraded curb ramps and other miscellaneous pedestrian safety improvements: The ADA curb ramp upgrades on various State Routes: Construction activities are ongoing along East Main Street and Market Street in Chattanooga. The contractor is working on removing and replacing the concrete sidewalk and curb ramps. The sidewalk will be closed in this area to all users. Lane closures may be required at times for construction activities. Signs and flaggers may be utilized during these lane closures. Motorists should use caution when traveling through the work zone. [Southern Constructors, Inc./Chattanooga East/CNY253]
REGION 2 The drain cleaning on various Interstate and State Routes: Drain cleaning operations are planned on I-75 from MM 0 to MM 18. This is a mobile operation along the inside shoulders with impacts to adjacent traffic lanes. These operations will occur at night between 8 PM and 6 AM.
[Sweeping Corporation of America, Inc./Chattanooga West/CNY226]
REGION 2 The on-call concrete pavement repair at various locations on various Interstate and State Routes: Vulcan Materials Co. will be painting lanes on previously repaired concrete pavement in Cumberland County in Crossville on I-40 at the following on or off ramps: WB on and off ramps at exit 320, EB on ramp at exit 320, WB off ramp at exit 322, EB on ramp at exit 322, and WB on ramp at exit 329. This work will be completed with a mobile operation using a truck mounted attenuator with a message board. Please use caution when driving through the work zones.
[Vulcan Construction Materials, LLC/Dunlap/CNX411]
REGION 2 The on-call guardrail repair and new guardrail installation on various Interstate and State Routes: The contractor will have short term shoulder and/or lane closures in order to perform guardrail repair. These closures will take place on the interstate nightly Sunday through Thursday from 7 PM to 6 AM and daily Monday through Friday on state routes. At least one travel lane will remain open to traffic at all times on the interstate, and flaggers will be present on state routes during any work that is performed. [Cumberland Guardrail, Inc./McMinnville/CNY105]
REGION 2 The sweeping on various Interstate and State Routes: Sweeping operations are planned throughout Region 2 this reporting period. Sweeping operations are mobile operations along the inside and outside shoulders with impacts to adjacent traffic lanes. These operations will occur at night between 8 PM and 6 AM for interstates and high traffic state routes, while daytime sweeping can be anticipated between 9 AM to 3 PM for lower traffic state routes.
[Sweeping Corporation of America, Inc./Chattanooga West/CNY210]
REGION 2 Various Interstate and SRs - Cable Barrier Repair: The contractor will have short-term shoulder and/or lane closures to perform cable barrier rail repair. These closures will take place on the interstate nightly, Sunday through Thursday from 7 PM to 6 AM and daily Monday through Friday. At least one travel lane will remain open to traffic at all times. Typically, only a shoulder closure will be used in the median, but lane closures will be employed as needed.
[LU, Inc./McMinnville/CNY183]
REGION 2 preventative and unscheduled maintenance of Chattanooga SmartWay Intelligent Transportation System: The contractor may have short-term shoulder and/or lane closures to perform preventative or unscheduled maintenance to the local SmartWay Intelligent Transportation System. At least one travel lane will always remain open to traffic. Flaggers will assist with traffic control as needed. [Lumin8 Transportation Technologies, LLC/Chattanooga East/CNX270]
RESTRICTIONS
FRANKLIN COUNTY - CNY068: Old Decherd Road at Wagner Creek is closed.
WARREN COUNTY - CNY196: Maximum width is 15 feet in both directions.
REGION 2 - CNX413: BRADLEY I-75 NB BETWEEN MM 25 and MM 35 AND MCMINN I-75 SB BETWEEN MM 44 and MM 36 both the inside and outside shoulders will be closed with concrete barrier rail installed. Total width will be 24 feet wide. Wide loads may need to utilize both lanes of traffic through this area.
###

Distribution channels:
Legal Disclaimer:
EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.
Submit your press release